We re-plan the whole floor, then rebuild it.
A full survey of the building — cabling, coverage, hardware age, phone points, power — followed by a phased replacement that leaves the business trading the whole way through.
Project
06 · Office Optimisation
Engagement
Project
Scope
Single office to multi-site
Based
Johannesburg, ZA
Offices rarely get rebuilt. They accumulate: a switch added here, a cable run there, until nobody knows what plugs into what.
The symptoms are familiar. Wi-Fi that dies in the corner offices. A rack nobody will touch because the cabling is unlabelled. Machines too slow for the work but replaced one at a time, so the office runs four different generations of hardware at once.
Office optimisation treats the floor as one system. We survey what is physically there, plan the rebuild properly — rack layout, access point placement, cable routes, desk positions — and then install in phases, mostly after hours, so no department loses a working day.
You end up with a labelled rack, a documented network, hardware on a known replacement cycle, and one company accountable for all of it.
Company-wide hardware, cabling and network refresh, rolled out in phases.
Every floor gets drawn before anything is bought.
The plan is the deliverable of the survey — a drawn layout of racks, cabling, coverage and desk positions. It is yours to keep, whether or not Greenstem does the build.

Installed in phases, trading throughout.
01 / Survey
Walk the building
Cable trace, coverage map, hardware inventory, power and rack audit.
02 / Plan
Draw the rebuild
Layout, placement and a phased schedule costed department by department.
03 / Build
Install in phases
After hours and in stages, so the business never stops trading.
04 / Hand over
Document and support
Labelled rack, network map, asset register, retained support.
- How disruptive is it?
- Planned properly, very little. We work department by department and do the cutover work after hours. The point of the phasing is that nobody loses a working day.
- Do we have to replace everything at once?
- No. The survey usually finds equipment worth keeping. The plan is phased partly so the cost spreads across a financial year.
- Can you work around a landlord or building manager?
- Yes. Cable routes, riser access and after-hours work all get arranged with the building as part of the planning phase.
- What does it cost?
- It depends entirely on the floor size and what the survey finds, which is why the audit comes first and is priced separately from the build. You get a real number before you commit to anything.
Start here
Start with the audit. It costs you a morning.
Tell us where things are breaking. We walk the site, map what you have, and come back with a phased plan and a real number.